From plans
to materials.

Turn residential drawings into a material list with quantities, drawing references, and calculation details. Review unresolved items and download the Excel workbook.

TMaple Street / Material takeoff
Preliminary · unpriced
A3.0Foundation & framing
Actual A3.0 foundation and framing drawing for the Maple Street residential addition
SOURCE / A3.0 · PAGE 91428 Maple Street, Skokie, IL
Keep the quantity and its drawing together.

Explore a real preliminary takeoff from the Maple Street plan set.

SAMPLE PROJECT1428 Maple StreetPreliminary · 145 lines · 81 unresolved · 17 items to resolve
145Material lines
64Base quantities available
81Quantities still unresolved
17Items to resolve

A first pass with a clear record of the work still outstanding. These counts describe the unfinished sample, not product performance. Quantities and specifications require review; material prices are not included.

Check each quantity against the drawing.

Keep the measurement, the specification, and the question in the same place.

01

Drawing references

Open the source sheet and see the calculation behind a material quantity.

Column pad detail from A3.0: 2 ft 6 in square footing with steel column callout
2'-6" × 2'-6" × 1'-0"A3.0 / 1 · Page 9
M004 / COLUMN PAD
0.23 CY

2.5 × 2.5 × 1 ÷ 27

dimensions 2'-6" × 2'-6" × 1'-0"
02

Items to resolve

Missing dimensions and conflicting details stay attached to the materials they affect.

Foundation clarificationC02
Footing width24 in / 22 in
A3.0 · planA4.0 · section
03

Download the material list.

Export the workbook and the items-to-resolve report for estimating and supplier quotes.

XLSMaterials estimateQuantities · basis · review status
DOCItems to resolveQuestions · sources · next actions
Download sample workbook

Materials covered.

Agree the included scope, review each quantity, then download the reports. The sample walks through all three.

  1. 01
    Choose scope

    Pick the buildings and material stages to include.

  2. 02
    Review quantities

    Check each quantity against its drawing and calculation.

  3. 03
    Download reports

    Export the material list and the items-to-resolve report.

New homesAdditionsDetached garages
MATERIAL STAGES01—06

FOUNDATION & SLAB

Concrete, reinforcement, base material, and anchors. Separate new work from retained slabs and existing foundations.

Pay per project.

Start with one residential project. Confirm the scope first, then keep the quantities, drawing references, and exports together.

Pay per project
Choose your own supplier
Keep your exports
RESIDENTIAL TAKEOFFProposed launch price
$99/ project

For an eligible residential project
with an agreed material scope.

  • Drawing-linked material quantities
  • Specifications and calculation basis
  • Outstanding items and source references
  • Editable workspace and exports
View sample takeoff

Eligibility and included stages confirmed first.
Supplier pricing and drawing revisions scoped separately.

Frequently asked questions.

What does the takeoff include?

A material list for the agreed scope, quantities supported by the drawings, calculation bases, source references, and a report of outstanding questions. The sample focuses on residential work before drywall.

Are material prices included?

The sample estimate is unpriced. Use the material workbook to request quotes from your supplier. Product selection, packaging, delivery increments, taxes, and final order quantities need separate confirmation.

What happens when drawings are unclear?

The affected quantity stays open with its drawing references and the clarification needed. For example, the Maple Street footing width differs between the foundation plan and section detail.

Can I use my own supplier?

Yes. The proposed project model is independent of a materials purchase. Export the takeoff and work with the supplier that fits your project.

Do I need to review the quantities?

Yes. Check quantities, specifications, waste, and unresolved questions before ordering. The workspace keeps the drawing source and calculation basis available for that review.

Open the sample takeoff.

Start with a real project. Follow a quantity back to the drawing.
See what is known—and what still needs an answer.

View sample takeoff
RESIDENTIAL MATERIALSDRAWING REFERENCESYOUR SUPPLIER
SAMPLE TAKEOFF